note Walls need work after high flows a few weeks ago and lack of maintenance over winter, but it's good. It's not as good as
Walls need work after high flows a few weeks ago and lack of maintenance over winter, but it's good. It's not as good as it was between 2004 and 2013, but it's good. Some of us will be working on the walls before long. It's best to avoid putting anything smaller than 150+ pound rocks on the end adjacent to the hole. Anything smaller than 150 to 200 pounds adjacent to the hole just washes into the hole Also, the upstream "buffer" wall is a critical feature. Without a sold upstream buffer wall, the main wall can't do its job.
-greg